JiraKarel Bielan · 12 September 2026

JQL for Dashboards: The Gadget That Should Be Empty

Nine copy-paste queries that flag missing fields. Switch them all on at once and the dashboard is noise by Friday — the rollout order matters more than the JQL.

Blog › Atlassian & ITSM › Jira

Most Jira dashboards die the same way. Someone builds one at the start of a project, fills it with pie charts, and within a month nobody reads it — because reading it means interpreting it, deciding whether forty-one open items is better or worse than last Thursday. A new instalment of the Jira Snippet Library comes at dashboards from the opposite end, and the idea underneath its nine queries is worth more than the queries.

What's in it

According to the article, published by Rachel Wright to the Atlassian Community on 8 September 2026, these are nine JQL queries meant to sit in dashboard gadgets. Not one of them measures throughput or velocity. Eight flag a missing field reporting depends on; the ninth a state:

  • assignee is EMPTY and status != "To Do" — work under way with nobody on it
  • "Story points" is EMPTY and status != "To Do"
  • originalEstimate is EMPTY and status != "To Do"
  • due is EMPTY and status != "To Do"
  • fixVersion is EMPTY and status != "To Do"
  • timeSpent is EMPTY and status != "To Do"
  • updated <= -2w and status != Done — untouched for a fortnight
  • resolution is EMPTY AND due < now() — past its date
  • status = "On Hold"

Each is prefixed with project = KEY, with your own key in place of KEY. The author says plainly that they may need more than that: "You may need to customize these to fit how your organization works." The piece is one instalment of a series — it closes with a link back to the intro and the article list, and the rest of that series is not in front of us here.

The inversion is the point

A normal dashboard is read by looking for a number. This one is read by checking for emptiness. A gadget with nothing in it means every in-flight item has an assignee, or an estimate, or a date. A gadget with rows in it is a task list for whoever owns the project. That is exception reporting — the same principle that makes monitoring alerts survivable, where silence is the healthy state and anything on screen is by definition something to act on. Cheaper on attention than a chart, and the only kind of dashboard I have seen people still opening after the first month.

The clauses are not uniform, and that is worth reading closely. Six of the nine filter on status != "To Do", which encodes a specific claim: a field only becomes mandatory once work has actually started. That is a sensible default and it is also an opinion. If your team estimates at refinement, that clause hides precisely the gap you wanted to see. The staleness query uses status != Done instead, and the overdue one drops status altogether in favour of resolution is EMPTY — the right call, since an item can sit in a Done-looking column without carrying a resolution.

One query is not like the others. status = "On Hold" does not look for missing data, it looks for a state, and it assumes a status with that exact name exists in the project. Where it doesn't, JQL rejects the value rather than returning nothing, so the gadget errors instead of sitting quietly empty. Worth noting too: in the source this single query is typeset with curly quotes while the rest use straight ones. Paste it as printed and it will not run. Retype the quotes.

What it means for your team

  • Switch on one, not nine. Point all nine at a project that has run for two years and every gadget fills with hundreds of rows on day one. Nobody clears that, and within a week the dashboard is noise — the exact failure the format was meant to avoid. Enable one check, backfill behind it, then add the second.
  • Every check declares a field mandatory. Putting the timeSpent gadget on a dashboard introduces time tracking as a team expectation, announced or not. That is a process decision arriving through a reporting change, and it deserves making deliberately.
  • Only check fields your process uses. The list assumes a team that estimates in story points and in hours, logs work, and ships in fix versions. A small team typically uses two or three of them. Flagging a field your process has no use for isn't hygiene, it is invented work, and it is the quickest way to make people resent their own Jira.
  • A dashboard waits to be visited. The article mentions filter subscriptions and automation rules in one sentence and moves on; that sentence deserved a section. "In progress with no assignee" wants delivering to a person, not discovering on a Wednesday by whoever opened the board.
  • Run each query before you mount it. If the count in the issue navigator is one nobody will act on, it does not belong on the dashboard.

What the article doesn't say is why these nine. There is no note on when a given check stops making sense, no guidance on rollout order, and the claim that reports come out empty or useless without assignees, estimates and dates is asserted with no number and no example behind it. The queries themselves are sound and genuinely copy-paste once the key is swapped, which is a real service; thin is not the same as wrong. Just read it as a pattern with nine illustrations rather than a checklist — the pattern travels, the list is somebody else's process.

Nine gadgets is nine fields your team has just been told to fill

A dashboard gadget is one of the few things in Jira you can add without anyone signing it off, and that is fine — an admin who writes their own filters should carry on writing them. What is hard to undo is what arrives alongside it: nine checks is nine fields the team has quietly been told to fill, and two years on that is a form nobody can explain and nobody is willing to shorten. The instances we get called into rarely have a JQL problem; they have eighteen required fields, half of them introduced to feed a report that stopped being read in the first quarter. Deciding which three fields a project genuinely reports on is an hour now against a cleanup project later, and that is the conversation our Atlassian consulting exists to have while it is still cheap.

Source: Atlassian Community · Karel Bielan, Atlassian consultant, want it s.r.o.