AdminKarel Bielan · 7 September 2026

ACP-620: Where Every Option Looks Correct

The real warning in this one isn't about the syllabus but the format: five or six options, several of them defensible - which also describes Jira project configuration.

Blog › Atlassian & ITSM › Admin

Most certification write-ups give a working admin nothing. This one has a line worth stopping on, and it isn’t about the exam. Listing the topics that caught him out, the author writes that “most options feel correct”. As a complaint about a multiple-choice format, fair enough. As a description of Jira project configuration on an ordinary Tuesday it is close to exact — which is the reason to read a post about ACP-620 even if you never intend to sit it.

What the write-up says

Published on 20 July 2026 in the Jira articles section of the Atlassian Community, Hari Krishna’s post is a personal retrospective on clearing ACP-620: Managing Jira Projects for Cloud. Per the article:

  • The format is the surprise, not the syllabus. Many questions carry five or six options, and a large share require selecting more than one correct answer — not the familiar four options with a single right one.
  • Four areas are named as deceptive: Boards, Reports, Permissions and project configurations. They look simple, he writes, until the answer choices appear.
  • The exam is characterised as “less about memorization and more about understanding how Jira behaves in real-world scenarios”. No sample question is given to support that.
  • It is his third certification this year, after ACP-120 and ACP-520, with ACP-420 and ACP-220 still to go for the full Atlassian Certified badge.

What the post does not contain: preparation time, exam fee, number of questions, pass mark, test duration. If you are trying to decide whether to book ACP-620, none of the practical figures are here.

How the preparation loop works

The method he describes is deliberately slow and begins in the documentation rather than in a question bank. He worked through the official Atlassian documentation for the syllabus “one topic, one concept, one document at a time”. After finishing a section he had ChatGPT generate multiple-choice questions from that section alone, explicitly asking for ACP-style questions — scenario-based, deliberately tricky. Answer them with confidence and move to the next topic; hesitate, and go back into the same documentation. Repeat.

Two properties of that loop are worth keeping. The model is never the authority: it writes the questions and the documentation holds the answers, so a bad question costs a detour into the docs rather than a wrong belief carried into a production change. And the scope is one section, not “test me on Jira” — the questions come from text the reader has just finished and can check line by line. The author is explicit that ChatGPT did not write the exam for him; it sharpened the preparation. He doesn’t dismiss mock tests either, naming Udemy and similar platforms as fine for the people they suit; he simply preferred concepts to memorised answers.

The post attaches no cost to any of this — no count of topics, no sense of how long one pass took. It reads as one person’s working habit: reasonable to borrow, poor to cite.

What it means for your team

Now drop the exam. The four areas singled out — boards, reports, permissions, project configuration — are not a random selection, and the source doesn’t say why they cluster, so here is our reading. Each of them behaves differently depending on context the question doesn’t state: whether the project is team-managed or company-managed, whether the setting sits on a scheme shared with other projects or on the project itself, and which role the user holds where. Several answers really are defensible until that context is pinned down. That is not an exam artefact. It is the same reason “can this person see this board?” takes an admin three clicks to answer honestly.

  • The multi-select shape is worth stealing for reviews. Instead of asking whether a configuration is correct, ask which of five settings could produce the behaviour someone reported. Enumerating the candidates finds the shared scheme you had forgotten about; a yes-or-no question doesn’t.
  • Permissions is where partial knowledge costs the most. Knowing what a permission scheme does is not the same as knowing what it does when three projects share it. Before touching one in production, list the projects bound to it and name who loses access — then make the change.
  • Project type is the ambiguity generator. Team-managed and company-managed projects can answer the same question differently — permissions most visibly — and it is exactly where a language model sounds most confident and is most often out of date. Anything hinging on it gets checked in the current documentation, not recalled.
  • Reports are the quiet one on that list. Nobody audits a report, because a report cannot break anything. It can, however, be read for two years by people who never asked which work items it leaves out.

What genuinely transfers from this post is small: the direction of the study loop, and the observation about the format. The rest is one admin’s year. But the format observation earns its credit — an exam that refuses to offer one obviously right answer is measuring something the job actually contains, and that is not a sentence one gets to write about certifications very often.

Which of your permission schemes is shared by projects nobody listed?

Boards, reports, permissions, project configuration — the four areas this post flags as deceptive are also the four an admin sets up personally, correctly, on the first afternoon of a new project. There is nothing wrong with doing that yourself, and it stays right for as long as the project stays alone. The instances we get called into are the ones where the same scheme quietly picked up nine more projects over three years, and working out which of them still needs which permission takes considerably longer than deciding it would have taken at the start. If what you need is a picture of what your permission and project configuration actually looks like today rather than what it was meant to look like, that is what our Atlassian audit work produces.

Source: Atlassian Community · Karel Bielan, Atlassian consultant, want it s.r.o.

← Back to all articles